Saltar al contenido
STAGING

Food and beverage

How to read document statuses in TRACES

Each status says who the document depends on now. Reading them is knowing who to call.

Updated on 13/08/2026

The question that repeats most during a season is not how to fill anything in: it is «why is this still stuck?». And the answer is always in the status. Each one says exactly one thing —who the document depends on right now— and reading it correctly is the difference between calling somebody who can unblock it and somebody who cannot.

The map: what each status means and what to do

StatusDepends onWhat to do
DRAFTYouIt is half-done: complete it
NEWThe circuit already startedIt was submitted; wait
VALIDATING AUTHORITY NOTIFIEDThe authorityAwait their decision
VALIDATING AUTHORITY SIGNEDYou againTransport and your signature are missing
ENDORSING AUTHORITY NOTIFIEDThe authorityProcessing Statement awaiting endorsement
DECLARING AUTHORITY NOTIFIEDThe authorityNon-manipulation under verification
VALIDNobodyFinished

Important

The two rows in bold are the ones that cost money, and for the same reason: both are cases where the ball is in your court and it does not look like it. A forgotten `DRAFT` and an unclosed `VALIDATING AUTHORITY SIGNED` are documents nobody is processing, that raise no error, and that nobody chases because from outside they look in progress.

How to review them without opening TRACES one by one

  1. 1

    Go in via «Dashboards» → «My pending certificates»

    The view built for this, avoiding document-by-document checking.

  2. 2

    Filter in «Documents» → «CATCH» by «Certificate status»

    The same filter needed to create a Processing Statement.

  3. 3

    Check «Notifications», top right

    Where authority decisions arrive.

  4. 4

    And consult the document's «History» tab

    It says what happened and when, which is what you need to chase with grounds.

Watch out

A habit that removes half the emergencies: check statuses as routine, not on incident. A stalled document does not announce itself. If review only happens when somebody asks about one consignment, the rest stay stalled — and are all discovered together, on the day there is a rush.

Worth knowing

Statuses verified in 2026-08 against the European Commission's official help (https://webgate.ec.europa.eu/IMSOC/tracesnt-help). TRACES is operated by the Commission and may change without notice. Whether this applies to you is for the competent authority and your adviser to determine.

›My document has been in «DRAFT» for days.

«DRAFT» means it is half-done and depends on you: nobody else will move it.

›The authority signed — is that it?

Not for the simplified one: you must complete transport and sign to reach «VALID».

›Where do I see what happened and when?

In the document's «History» tab.

A real case

The situation

Three documents sit in «DRAFT» for weeks unnoticed.

What you do

  1. Shows which formalities remain unfinished

What you get

They are closed before there is a rush.

The situation

The authority is chased over a document that depended on you.

What you do

  1. Records who each formality depends on

What you get

The call goes to whoever can resolve it.

The situation

The decision lands in «Notifications» and nobody sees it.

What you do

  1. Reflects the formality's status in the file

What you get

Follow-up does not depend on checking TRACES.

The situation

You need to chase and nobody knows since when it has been stuck.

What you do

  1. Keeps the date of each status change

What you get

The chase happens with dates.

This article answers

  • catch certificate statuses in traces
  • what does validating authority notified mean
  • endorsing authority notified what to do
  • my certificate is still in draft
  • traces nt manual document statuses